|
|
|
|
LEADER |
00000cam a22000002a 4500 |
001 |
ocm44706720 |
003 |
OCoLC |
005 |
20141204193612.0 |
008 |
020617s2001 njua 000 0 eng d |
010 |
|
|
|a 00711674
|
035 |
|
|
|a (Sirsi) a334452
|
040 |
|
|
|a COD
|c COD
|d DLC
|d UKM
|d UV#
|
020 |
|
|
|a 0130832073
|
050 |
|
4 |
|a TH435
|b O87
|
082 |
|
4 |
|a 624/.029/9
|2 21
|
100 |
1 |
|
|a Ostwald, Phillip F.,
|d 1931-
|
245 |
1 |
0 |
|a Construction cost analysis and estimating /
|c Phillip F. Ostwald.
|
260 |
|
|
|a Upper Saddle River., N.J. :
|b Prentice Hall,
|c c2001.
|
300 |
|
|
|a xvii, 462 p. :
|b il. ;
|c 26 cm.
|
490 |
0 |
|
|a Prentice Hall international series in civil engineering and engineering mechanics
|
504 |
|
|
|a Incluye bibliografías.
|
650 |
|
4 |
|a Construcción
|x Presupuestos.
|
901 |
|
|
|a Z0
|b UV#
|
902 |
|
|
|a DBUV
|
596 |
|
|
|a 15
|
942 |
|
|
|c LIBRO
|
999 |
|
|
|c 130329
|d 130329
|