Cargando…
HIE-ISOLDE: the technical options
The ISOLDE facility at CERN has a long and successful tradition of continuous development and growth in order to meet the scientific requests from the user community. The current situation continues this habit and several projects to increase the scientific scope of the facility through technical de...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2006
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2006-013 http://cds.cern.ch/record/1001782 |
_version_ | 1780911600930127872 |
---|---|
author | Lindroos, Mats Nilsson, Thomas |
author_facet | Lindroos, Mats Nilsson, Thomas |
author_sort | Lindroos, Mats |
collection | CERN |
description | The ISOLDE facility at CERN has a long and successful tradition of continuous development and growth in order to meet the scientific requests from the user community. The current situation continues this habit and several projects to increase the scientific scope of the facility through technical developments are under way or envisaged within the medium-term future planning. These developments will result in a transformed facility with the label HIE (High Intensity and Energy)-ISOLDE where the intensity, quality, and energy range of the secondary beams will be substantially improved. They are largely in line with the necessary technical developments towards the future EURISOL facility. This report summarizes these development projects. |
id | cern-1001782 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
publisher | CERN |
record_format | invenio |
spelling | cern-10017822021-07-30T13:15:33Zdoi:10.5170/CERN-2006-013http://cds.cern.ch/record/1001782engLindroos, MatsNilsson, ThomasHIE-ISOLDE: the technical optionsAccelerators and Storage RingsThe ISOLDE facility at CERN has a long and successful tradition of continuous development and growth in order to meet the scientific requests from the user community. The current situation continues this habit and several projects to increase the scientific scope of the facility through technical developments are under way or envisaged within the medium-term future planning. These developments will result in a transformed facility with the label HIE (High Intensity and Energy)-ISOLDE where the intensity, quality, and energy range of the secondary beams will be substantially improved. They are largely in line with the necessary technical developments towards the future EURISOL facility. This report summarizes these development projects.CERNCERN-2006-013CERN-HIE-ISOLDE-PROJECT-Note-0001HIE-ISOLDE-PROJECT-Note-0001oai:cds.cern.ch:10017822006 |
spellingShingle | Accelerators and Storage Rings Lindroos, Mats Nilsson, Thomas HIE-ISOLDE: the technical options |
title | HIE-ISOLDE: the technical options |
title_full | HIE-ISOLDE: the technical options |
title_fullStr | HIE-ISOLDE: the technical options |
title_full_unstemmed | HIE-ISOLDE: the technical options |
title_short | HIE-ISOLDE: the technical options |
title_sort | hie-isolde: the technical options |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.5170/CERN-2006-013 http://cds.cern.ch/record/1001782 |
work_keys_str_mv | AT lindroosmats hieisoldethetechnicaloptions AT nilssonthomas hieisoldethetechnicaloptions |