Cargando…
T2K Phase-I
The T2K project, the first superbeam long-baseline neutrino oscillation experiment connecting 295 km between the J-PARC 50 GeV Proton Synchrotron at Tokai and Super-Kamiokande, was approved and beam-line construction at Tokai has been started towards the commissioning scheduled in early 2009. A tuna...
Autor principal: | Ishida, T |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nuclphysbps.2005.05.037 http://cds.cern.ch/record/1001876 |
Ejemplares similares
-
NP triple scattering experiments and I=O NN phase sifts
por: Bugg, D V, et al.
Publicado: (1978) -
Muon diffusion in copper below 2 K
por: Welter, J M, et al.
Publicado: (1983) -
The half-life of the low-lying 1/2$^{+}$ in $^{123}$I and $^{121}$I
por: Schrader, H, et al.
Publicado: (1970) -
Hypernuclear production via the (p,p'K), (p,dK) and (p,$\alpha$K) reactions
por: Yen, S
Publicado: (1994) -
The half-life of the low-lying 1/2 + levels in $^{123}I $ and $^{121}I$
por: Schrader, H, et al.
Publicado: (1970)