Cargando…
One of the undulators installed in the LHC tunnel
From right to left, back row: Lucio Rossi (group leader, MCS), Davide Tommasini (conceptual design, MCS), Thierry Tenaglia (integration design,TS-MME), Remo Maccaferri (project leader, MCS) and Hans Kummer (MCS/ME); front row: Gilles Trachez (MCS-ME) and Bruno Meunier (FSU-AT12).
Publicado: |
2006
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1005504 |
Ejemplares similares
-
The team responsible for installing the superconducting magnets in the LHC tunnel is celebrating the installation of the fiftieth superconducting dipole
Publicado: (2005) -
Quench Simulations for the LHC Undulator
por: Hilaire, A, et al.
Publicado: (2003) -
The Comparison of Vacuum Performance in the Undulator Chambers Installed at the Taiwan Light Source
por: Chang, S H, et al.
Publicado: (1999) -
Measurements of the beam heat load in the cold bore superconductive undulator installed at ANKA
por: Casalbuoni, S
Publicado: (2007) -
Equipment for tunnel installation of main and insertion LHC cryo-magnet
por: Artoos, Kurt, et al.
Publicado: (2006)