Cargando…

Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3

The 3 TeV compact linear collider, CLIC, foresees an RF source based on a high current drive beam running parallel with the main linac. To generate this drive beam of very high instantaneous power a sophisticated complex consisting of a fully beam-loaded linac and several stages of beam compression...

Descripción completa

Detalles Bibliográficos
Autor principal: Braun, H H
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1014775
_version_ 1780911962614398976
author Braun, H H
author_facet Braun, H H
author_sort Braun, H H
collection CERN
description The 3 TeV compact linear collider, CLIC, foresees an RF source based on a high current drive beam running parallel with the main linac. To generate this drive beam of very high instantaneous power a sophisticated complex consisting of a fully beam-loaded linac and several stages of beam compression is used. Although this scheme is very promising in terms of cost and power efficiency, it needs demonstration in a scaled version before construction of CLIC can be envisaged. This is the aim of the CLIC Test Facility CTF3, built by an international collaboration. CTF3 is constructed and exploited in several phases. Here we report present status, experimental achievements and future plans for CTF3.
id cern-1014775
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10147752023-07-20T15:07:31Zhttp://cds.cern.ch/record/1014775engBraun, H HTowards a Multi TeV Linear Collider: Drive Beam Generation With CTF3Accelerators and Storage RingsThe 3 TeV compact linear collider, CLIC, foresees an RF source based on a high current drive beam running parallel with the main linac. To generate this drive beam of very high instantaneous power a sophisticated complex consisting of a fully beam-loaded linac and several stages of beam compression is used. Although this scheme is very promising in terms of cost and power efficiency, it needs demonstration in a scaled version before construction of CLIC can be envisaged. This is the aim of the CLIC Test Facility CTF3, built by an international collaboration. CTF3 is constructed and exploited in several phases. Here we report present status, experimental achievements and future plans for CTF3.CERN-OPEN-2007-004CLIC-Note-705oai:cds.cern.ch:10147752007-02-05
spellingShingle Accelerators and Storage Rings
Braun, H H
Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title_full Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title_fullStr Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title_full_unstemmed Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title_short Towards a Multi TeV Linear Collider: Drive Beam Generation With CTF3
title_sort towards a multi tev linear collider: drive beam generation with ctf3
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1014775
work_keys_str_mv AT braunhh towardsamultitevlinearcolliderdrivebeamgenerationwithctf3