Cargando…
LEIR closed orbit measurement system
In the Low Energy Ion Ring (LEIR) continuous (every 10 ms) tracking of the closed orbit is necessary during the acceleration and on request. To do so parts of the existing hardware, mainly the pick-ups (PUs) and cables, from LEAR have been re-used while other parts like the head amplifiers and the a...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1016725 |
_version_ | 1780912006644105216 |
---|---|
author | Belochitckii, P Korchagin, D Soby, L |
author_facet | Belochitckii, P Korchagin, D Soby, L |
author_sort | Belochitckii, P |
collection | CERN |
description | In the Low Energy Ion Ring (LEIR) continuous (every 10 ms) tracking of the closed orbit is necessary during the acceleration and on request. To do so parts of the existing hardware, mainly the pick-ups (PUs) and cables, from LEAR have been re-used while other parts like the head amplifiers and the acquisition system has been re-designed. This note describes the hardware and software developed for the closed orbit measurement system as well as measurement results. The commissioning of LEIR started in September 2005 and is now close to nominal operation. |
id | cern-1016725 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10167252019-09-30T06:29:59Zhttp://cds.cern.ch/record/1016725engBelochitckii, PKorchagin, DSoby, LLEIR closed orbit measurement systemAccelerators and Storage RingsIn the Low Energy Ion Ring (LEIR) continuous (every 10 ms) tracking of the closed orbit is necessary during the acceleration and on request. To do so parts of the existing hardware, mainly the pick-ups (PUs) and cables, from LEAR have been re-used while other parts like the head amplifiers and the acquisition system has been re-designed. This note describes the hardware and software developed for the closed orbit measurement system as well as measurement results. The commissioning of LEIR started in September 2005 and is now close to nominal operation.AB-Note-2007-013CERN-AB-Note-2007-013oai:cds.cern.ch:10167252007-02-16 |
spellingShingle | Accelerators and Storage Rings Belochitckii, P Korchagin, D Soby, L LEIR closed orbit measurement system |
title | LEIR closed orbit measurement system |
title_full | LEIR closed orbit measurement system |
title_fullStr | LEIR closed orbit measurement system |
title_full_unstemmed | LEIR closed orbit measurement system |
title_short | LEIR closed orbit measurement system |
title_sort | leir closed orbit measurement system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1016725 |
work_keys_str_mv | AT belochitckiip leirclosedorbitmeasurementsystem AT korchagind leirclosedorbitmeasurementsystem AT sobyl leirclosedorbitmeasurementsystem |