The installation of the Large Hadron Collider at CERN is now approaching completion. Almost 1100 of the 1232 main bending magnets are installed and the whole ring will be installed by the end of March 2007. Emphasis is now moving from installation to commissioning, with the cool down of the first of...

Descripción completa

Detalles Bibliográficos
Autor principal: Evans, L
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1018788
_version_ 1780912021633499136
author Evans, L
author_facet Evans, L
author_sort Evans, L
collection CERN
description The installation of the Large Hadron Collider at CERN is now approaching completion. Almost 1100 of the 1232 main bending magnets are installed and the whole ring will be installed by the end of March 2007. Emphasis is now moving from installation to commissioning, with the cool down of the first of the 8 sectors to liquid helium temperature well underway. In the other sectors, interconnect work is proceeding at a satisfactory pace and will be finished by the end of August. It is foreseen to inject the first beam into the LHC in November with the objective of having first collisions at the injection energy (450 GeV/c) in order to debug the machine and detectors before stopping for the annual winter shutdown. During this time, the detector installation will be finished and the machine will be pushed to full current ready for the first physics run at 7 TeV per beam in 2008.
id cern-1018788
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10187882023-05-31T13:22:32Zhttp://cds.cern.ch/record/1018788engEvans, LLHC StatusAccelerators and Storage RingsThe installation of the Large Hadron Collider at CERN is now approaching completion. Almost 1100 of the 1232 main bending magnets are installed and the whole ring will be installed by the end of March 2007. Emphasis is now moving from installation to commissioning, with the cool down of the first of the 8 sectors to liquid helium temperature well underway. In the other sectors, interconnect work is proceeding at a satisfactory pace and will be finished by the end of August. It is foreseen to inject the first beam into the LHC in November with the objective of having first collisions at the injection energy (450 GeV/c) in order to debug the machine and detectors before stopping for the annual winter shutdown. During this time, the detector installation will be finished and the machine will be pushed to full current ready for the first physics run at 7 TeV per beam in 2008.LHC-PROJECT-Report-983CERN-LHC-PROJECT-Report-983oai:cds.cern.ch:10187882007-02-22
spellingShingle Accelerators and Storage Rings
Evans, L
LHC Status
title LHC Status
title_full LHC Status
title_fullStr LHC Status
title_full_unstemmed LHC Status
title_short LHC Status
title_sort lhc status
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1018788
work_keys_str_mv AT evansl lhcstatus