Cargando…
Operation for LHC Cryomagnet Tests: Concerns, Challenges & Successful Collaboration
The LHC construction phase is coming to a close, with installation work progressing rapidly and beam start-up foreseen by end 2007. For the testing of the 1706 LHC cryomagnets in cryogenic conditions and its successful completion by early 2007, considerable challenges had to be overcome since 2002 t...
Autor principal: | Chohan, V |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1018974 |
Ejemplares similares
-
The Interconnections of the LHC Cryomagnets
por: Jacquemod, A, et al.
Publicado: (2001) -
The Alignment Jacks of the LHC Cryomagnets
por: Dwivedi, J, et al.
Publicado: (2004) -
The Preparation of the Cryomagnets and the Assembly of the LHC Test String 2
por: Andujar, O, et al.
Publicado: (2001) -
Organisation of the interconnections of the cryomagnets in the LHC tunnel
por: Tock, J P
Publicado: (2003) -
The Hardware Recognition System for the SM18 LHC Cryomagnet Test Benches
por: Coutinho-Ferreira, P M, et al.
Publicado: (2003)