First DT+RPC chambers installation round in the UX5 cavern
DT+RPC packages corresponding to sectors 1 and 7 of the barrel region cannot be installed on surface, since the lowering gantry from SX5 to UX5 uses their gaps to hold the wheels. Therefore this installation has to be carried out in the cavern. These pictures illustrate the first installation round...
Autor principal: | Jesus Puerta-Pelayo |
---|---|
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1019185 |
Ejemplares similares
-
First installation of DT and RPC packages into the CMS iron yoke
por: Jesus Puerta-Pelayo
Publicado: (2004) -
Completion of installation of DT and RPC chambers before Cosmic Challenge
por: Mimmo Dattola
Publicado: (2006) -
Installation of last DT+RPC packages for the muon barrel detector of CMS
por: Jesus Puerta-Pelayo
Publicado: (2007) -
Assembly of Drift Tubes (DT) Chambers at CIEMAT (Madrid)
por: Jesus Puerta-Pelayo
Publicado: (2003) -
First joint test beam of CMS Drift Tubes (DT) and Resistive Plate Chambers (RPC)
por: Paolo Giacomelli
Publicado: (2001)