Cargando…
Slow third-integer extraction on the ramp before the 200 GeV flat top. Test on 5th December 1977
Autores principales: | Actis, P, Bosser, Jacques, Kissler, Karl Heinz, Scandale, Walter |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1020085 |
Ejemplares similares
-
Slow third-integer extraction on the ramp after the 200 GeV flat top: Tests on 22nd and on 25th August 1977
por: Actis, P, et al.
Publicado: (1977) -
Slow Extraction and Fast Extraction on a 200 GeV/c Flat Top
por: Actis, P, et al.
Publicado: (1976) -
Half-integer extraction tests on 28th January, 1977
por: Kissler, Karl Heinz, et al.
Publicado: (1977) -
Fast half-integer extraction at $Q_{H}$ = 26.5: Tests on 18th, 23rd and 30th March, 1977
por: Kissler, Karl Heinz, et al.
Publicado: (1977) -
Half-integer extraction at $Q_{H}$ = 26.5: Observations made during the start-up and the first days of operation after the shut-down of May, 1977
por: Kissler, Karl Heinz, et al.
Publicado: (1977)