Cargando…
The installation and bakeout shell of ALICE's central beryllium beam pipe and absorber beam pipe, running through the middle of the Inner Tracker System (ITS) and Time Projection Chamber (TPC)
Publicado: |
2007
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1033950 |
Ejemplares similares
-
One end of the vacuum sector during the bakeout and pure gas refill of ALICE's central beryllium beam pipe and absorber beam pipe.
Publicado: (2007) -
Installation of the CMS beam pipe.
Publicado: (2008) -
One of the ALICE Absorber beam pipes ready for lowering into the solenoid magnet for NEG coating.
Publicado: (2006) -
VA BEAM PIPE COOLING FOR BAKEOUT CONDITIONS
por: Elias, N, et al.
Publicado: (2003) -
BEAM PIPE IS INSTALLED
Publicado: (2009)