Cargando…
One end of the vacuum sector during the bakeout and pure gas refill of ALICE's central beryllium beam pipe and absorber beam pipe.
Publicado: |
2007
|
---|---|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1033951 |
Ejemplares similares
-
The installation and bakeout shell of ALICE's central beryllium beam pipe and absorber beam pipe, running through the middle of the Inner Tracker System (ITS) and Time Projection Chamber (TPC)
Publicado: (2007) -
One of the ALICE Absorber beam pipes ready for lowering into the solenoid magnet for NEG coating.
Publicado: (2006) -
VA BEAM PIPE COOLING FOR BAKEOUT CONDITIONS
por: Elias, N, et al.
Publicado: (2003) -
Installation of the CMS beam pipe.
Publicado: (2008) -
Proposal to negotiate a contract for the supply of beryllium UHV beam pipes for LHCb
Publicado: (2004)