Cargando…
Helium transfer line installation details.
A particularity of the 32 m long four in one helium transfer line in between the cold box in USC55 and the cavern UX5 is the fact that the transfer line passes through a hole in the crane rail support beam. In order to ensure the alignment of the suspension rail in the interconnecting tunnel with th...
Autor principal: | G. Perinic |
---|---|
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1034456 |
Ejemplares similares
-
Montage photograph: Cryogenic components mounted on top of the central yoke barrel in the configuration for the acceptance tests of the helium refrigeration system comprising the intermediate cryostat (right), the test cryostat (left) and the cryogenic transfer lines.
por: Goran Perinic
Publicado: (2003) -
Installation of the intermediate cryostat.
por: Goran Perinic
Publicado: (2003) -
Installation of the LN2 tank in its final position.
por: G. Perinic
Publicado: (2007) -
Cryogenic cold box during installation.
por: Goran Perinic
Publicado: (2003) -
Lowering of the cryogenic transfer line segments to USC55.
por: Goran Perinic
Publicado: (2004)