PS Main Units Characteristic of the 101 main units and their PFW
This note is an update of the PS main units characteristics and their PFW. During the long shutdown of 2004/2006 and the annual shutdown 2006/2007 a total quantity of 34 main units have been dismantled, refurbished and re-installed. This note replaces the previous note AB-Note-2006-010 OP, from 28 F...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1035151 |
Sumario: | This note is an update of the PS main units characteristics and their PFW. During the long shutdown of 2004/2006 and the annual shutdown 2006/2007 a total quantity of 34 main units have been dismantled, refurbished and re-installed. This note replaces the previous note AB-Note-2006-010 OP, from 28 February 2006. |
---|