Status of the SPL at CERN
The construction of the Large Hadron Collider at CERN is in its final phase, and commissioning with beam is scheduled to begin before the end of 2007. It is now time to prepare for increasing as much as possible the performance of this unique instrument to maximize the benefits for physics. An essen...