Cargando…

Simultaneous Tune and Coupling Feedback during RHIC Run 6

The Relativistic Heavy Ion Collider (RHIC) is a versatile facility, capable of operating with both polarized protons and a variety of ion species over a broad range of energies. Acceleration ramp requirements change frequently to meet the needs of the physics experiments. There has been an ongoing e...

Descripción completa

Detalles Bibliográficos
Autores principales: Cameron, P, Della Penna, A, Hoff, L, Gasior, M, Jones, R, Luo, Y, Marusic, A, Ptitsyn, V, Schultheiss, C, Tan, C Y, Tepikian, S
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.2401402
http://cds.cern.ch/record/1038990
_version_ 1780912587124244480
author Cameron, P
Della Penna, A
Hoff, L
Gasior, M
Jones, R
Luo, Y
Marusic, A
Ptitsyn, V
Schultheiss, C
Tan, C Y
Tepikian, S
author_facet Cameron, P
Della Penna, A
Hoff, L
Gasior, M
Jones, R
Luo, Y
Marusic, A
Ptitsyn, V
Schultheiss, C
Tan, C Y
Tepikian, S
author_sort Cameron, P
collection CERN
description The Relativistic Heavy Ion Collider (RHIC) is a versatile facility, capable of operating with both polarized protons and a variety of ion species over a broad range of energies. Acceleration ramp requirements change frequently to meet the needs of the physics experiments. There has been an ongoing effort at RHIC to implement reliable betatron tune feedback as a tool for ramp development, and possibly to control tune during routine operations. Vertical orbit fluctuations in the chromaticity correction sextupoles during ramping are sufficient to fully couple the tunes. This complicates tune control, and with tune feedback causes the basis in which tune errors are reported to not match the basis used to correct the quadrupole currents, leading to feedback instability. This problem has been overcome by using realtime measurements of the coupling projections of both betatron eigenmodes to close feedback loops onto two skew quadrupole families. This minimizes coupling and matches the tune and coupling reporting basis to the correction basis. We report on successful simultaneous tune and coupling feedback during RHIC ramp development and implications of this effort for the LHC.
id cern-1038990
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-10389902019-09-30T06:29:59Zdoi:10.1063/1.2401402http://cds.cern.ch/record/1038990engCameron, PDella Penna, AHoff, LGasior, MJones, RLuo, YMarusic, APtitsyn, VSchultheiss, CTan, C YTepikian, SSimultaneous Tune and Coupling Feedback during RHIC Run 6Accelerators and Storage RingsThe Relativistic Heavy Ion Collider (RHIC) is a versatile facility, capable of operating with both polarized protons and a variety of ion species over a broad range of energies. Acceleration ramp requirements change frequently to meet the needs of the physics experiments. There has been an ongoing effort at RHIC to implement reliable betatron tune feedback as a tool for ramp development, and possibly to control tune during routine operations. Vertical orbit fluctuations in the chromaticity correction sextupoles during ramping are sufficient to fully couple the tunes. This complicates tune control, and with tune feedback causes the basis in which tune errors are reported to not match the basis used to correct the quadrupole currents, leading to feedback instability. This problem has been overcome by using realtime measurements of the coupling projections of both betatron eigenmodes to close feedback loops onto two skew quadrupole families. This minimizes coupling and matches the tune and coupling reporting basis to the correction basis. We report on successful simultaneous tune and coupling feedback during RHIC ramp development and implications of this effort for the LHC.oai:cds.cern.ch:10389902006
spellingShingle Accelerators and Storage Rings
Cameron, P
Della Penna, A
Hoff, L
Gasior, M
Jones, R
Luo, Y
Marusic, A
Ptitsyn, V
Schultheiss, C
Tan, C Y
Tepikian, S
Simultaneous Tune and Coupling Feedback during RHIC Run 6
title Simultaneous Tune and Coupling Feedback during RHIC Run 6
title_full Simultaneous Tune and Coupling Feedback during RHIC Run 6
title_fullStr Simultaneous Tune and Coupling Feedback during RHIC Run 6
title_full_unstemmed Simultaneous Tune and Coupling Feedback during RHIC Run 6
title_short Simultaneous Tune and Coupling Feedback during RHIC Run 6
title_sort simultaneous tune and coupling feedback during rhic run 6
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1063/1.2401402
http://cds.cern.ch/record/1038990
work_keys_str_mv AT cameronp simultaneoustuneandcouplingfeedbackduringrhicrun6
AT dellapennaa simultaneoustuneandcouplingfeedbackduringrhicrun6
AT hoffl simultaneoustuneandcouplingfeedbackduringrhicrun6
AT gasiorm simultaneoustuneandcouplingfeedbackduringrhicrun6
AT jonesr simultaneoustuneandcouplingfeedbackduringrhicrun6
AT luoy simultaneoustuneandcouplingfeedbackduringrhicrun6
AT marusica simultaneoustuneandcouplingfeedbackduringrhicrun6
AT ptitsynv simultaneoustuneandcouplingfeedbackduringrhicrun6
AT schultheissc simultaneoustuneandcouplingfeedbackduringrhicrun6
AT tancy simultaneoustuneandcouplingfeedbackduringrhicrun6
AT tepikians simultaneoustuneandcouplingfeedbackduringrhicrun6