Cargando…
The LEIR LLRF DSP-Carrier Board : Performance, CPS Renovation Plan and Recommendations
The LEIR LLRF project started in late 2003 and included designing,manufacturing and commissioning a novel, all-digital beam control system. The project was first to provide the LEIR machine with a beam control system satisfying the many performance requirements. This was achieved in 2006 with the su...
Autor principal: | Angoletta, M E |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1039137 |
Ejemplares similares
-
The DSP-Carrier Board Used by the LEIR Low-Level RF System: User's Manual
por: Angoletta, M E
Publicado: (2007) -
CERN's PS Booster LLRF renovation : plans and initial beam tests
por: Angoletta, ME, et al.
Publicado: (2010) -
CERN's LEIR Digital LLRF : system overview and operational experience
por: Angoletta, ME, et al.
Publicado: (2010) -
PSB LLRF renovation: Initial beam tests of the new digital beam control system
por: Angoletta, ME, et al.
Publicado: (2009) -
LEIR longitudinal studies
por: Albright, S, et al.
Publicado: (2017)