Cargando…
ALICE Detector Status and Commissioning
The Large Hadron Collider (LHC) will start operation in the end of 2007 colliding proton and lead beams at \surd S = 14 TeV and \surd S_{NN} = 5.5 TeV, respectively. The accelerator and the experiments are under construction and detailed studies of the physics program are being prepared. I will in t...
Autor principal: | Gustafsson, Hans-Ake |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1048614 |
Ejemplares similares
-
LHCb detector status and commissioning
por: Pietrzyk, B.
Publicado: (2007) -
Commissioning of the ATLAS Tracking Detector
por: Martin, Franck F
Publicado: (2008) -
The CMS Pixel Detector: from production to commissioning
por: Chiochia, Vincenzo
Publicado: (2007) -
The ALICE detector and trigger strategy for diffractive and electromagnetic processe
por: Schicker, R.
Publicado: (2008) -
Experience with CMS pixel software commissioning
por: Chiochia, V.
Publicado: (2008)