Cargando…

Radiation safety with high power operation of EURISOL

The European Community has launched the design study for a next generation RIB facility able to increase by a few orders of magnitude, the exotic beam intensity and availability in Europe. Forty institutes and laboratories within Europe, North America and Asia are taking part in this consortium, nam...

Descripción completa

Detalles Bibliográficos
Autores principales: Ridikas, D, Herrera-Martínez, A
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1048811
_version_ 1780912830419042304
author Ridikas, D
Herrera-Martínez, A
author_facet Ridikas, D
Herrera-Martínez, A
author_sort Ridikas, D
collection CERN
description The European Community has launched the design study for a next generation RIB facility able to increase by a few orders of magnitude, the exotic beam intensity and availability in Europe. Forty institutes and laboratories within Europe, North America and Asia are taking part in this consortium, named EURISOL DS project (European Isotope Separation On Line Design Study). In EURISOL, four target stations are foreseen, three direct targets of approximately 100 kW of beam power and one multi-MW (MMW) target assembly, all driven by a high-power particle accelerator. In this MMW station, high-intensity RIBs of neutron-rich isotopes will be obtained by inducing fission in several actinide targets surrounding a liquid metal spallation neutron source. The envisaged increase in RIB intensities at EURISOL means a drastic increase of the radioactive inventory and corresponding radioprotection related issues. Safety aspects of the future RIB production targets (aiming at a few ~1015 fissions/s) will become decisive in limiting the beam intensities, in selecting the production method and materials, and in the final cost of the facility. New technical challenges arise that will in most cases also critically affect the safety approval procedures. The handling and disposal of open radioactive high intensity RIB production targets (e.g. UCx, ThCx) including liquid Hg converter target is yet unexplored. Equally, containment of gaseous radioactivity and its migration will be crucial in the same context. The progress made so far on most of these issues within Task 2 "multi-MW target" and Task 5 "Safety and Radioprotection" will be summarized.
id cern-1048811
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10488112019-09-30T06:29:59Zhttp://cds.cern.ch/record/1048811engRidikas, DHerrera-Martínez, ARadiation safety with high power operation of EURISOLNuclear Physics2: TASK 25: TASK 5The European Community has launched the design study for a next generation RIB facility able to increase by a few orders of magnitude, the exotic beam intensity and availability in Europe. Forty institutes and laboratories within Europe, North America and Asia are taking part in this consortium, named EURISOL DS project (European Isotope Separation On Line Design Study). In EURISOL, four target stations are foreseen, three direct targets of approximately 100 kW of beam power and one multi-MW (MMW) target assembly, all driven by a high-power particle accelerator. In this MMW station, high-intensity RIBs of neutron-rich isotopes will be obtained by inducing fission in several actinide targets surrounding a liquid metal spallation neutron source. The envisaged increase in RIB intensities at EURISOL means a drastic increase of the radioactive inventory and corresponding radioprotection related issues. Safety aspects of the future RIB production targets (aiming at a few ~1015 fissions/s) will become decisive in limiting the beam intensities, in selecting the production method and materials, and in the final cost of the facility. New technical challenges arise that will in most cases also critically affect the safety approval procedures. The handling and disposal of open radioactive high intensity RIB production targets (e.g. UCx, ThCx) including liquid Hg converter target is yet unexplored. Equally, containment of gaseous radioactivity and its migration will be crucial in the same context. The progress made so far on most of these issues within Task 2 "multi-MW target" and Task 5 "Safety and Radioprotection" will be summarized.The Eighth International Topical Meeting on Nuclear Applications and Utilization of Accelerators (AccApp07), July 30 to August 2, 2007 in Pocatello, Idaho, USACERN-OPEN-2007-020EURISOL-02-22-2008-0057EURISOL-05-22-2007-0041oai:cds.cern.ch:10488112007-07-26
spellingShingle Nuclear Physics
2: TASK 2
5: TASK 5
Ridikas, D
Herrera-Martínez, A
Radiation safety with high power operation of EURISOL
title Radiation safety with high power operation of EURISOL
title_full Radiation safety with high power operation of EURISOL
title_fullStr Radiation safety with high power operation of EURISOL
title_full_unstemmed Radiation safety with high power operation of EURISOL
title_short Radiation safety with high power operation of EURISOL
title_sort radiation safety with high power operation of eurisol
topic Nuclear Physics
2: TASK 2
5: TASK 5
url http://cds.cern.ch/record/1048811
work_keys_str_mv AT ridikasd radiationsafetywithhighpoweroperationofeurisol
AT herreramartineza radiationsafetywithhighpoweroperationofeurisol