Cargando…

Production of the CMS Tracker End Cap sub-structures

The production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes...

Descripción completa

Detalles Bibliográficos
Autor principal: Fontaine, Jean-Charles
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:https://dx.doi.org/10.1016/j.nima.2007.07.129
http://cds.cern.ch/record/1049921
_version_ 1780912843313381376
author Fontaine, Jean-Charles
author_facet Fontaine, Jean-Charles
author_sort Fontaine, Jean-Charles
collection CERN
description The production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes all over Europe, will then be explained. The petal assembly and testing procedure will be quickly described. The quality assurance put in place at each production step has resulted in a very high petal quality, as some overall plots will attest. Finally some details about part failures will be given.
id cern-1049921
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10499212019-09-30T06:29:59Zdoi:10.1016/j.nima.2007.07.129http://cds.cern.ch/record/1049921engFontaine, Jean-CharlesProduction of the CMS Tracker End Cap sub-structuresDetectors and Experimental TechniquesThe production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes all over Europe, will then be explained. The petal assembly and testing procedure will be quickly described. The quality assurance put in place at each production step has resulted in a very high petal quality, as some overall plots will attest. Finally some details about part failures will be given.CMS-CR-2007-030oai:cds.cern.ch:10499212007-02-28
spellingShingle Detectors and Experimental Techniques
Fontaine, Jean-Charles
Production of the CMS Tracker End Cap sub-structures
title Production of the CMS Tracker End Cap sub-structures
title_full Production of the CMS Tracker End Cap sub-structures
title_fullStr Production of the CMS Tracker End Cap sub-structures
title_full_unstemmed Production of the CMS Tracker End Cap sub-structures
title_short Production of the CMS Tracker End Cap sub-structures
title_sort production of the cms tracker end cap sub-structures
topic Detectors and Experimental Techniques
url https://dx.doi.org/10.1016/j.nima.2007.07.129
http://cds.cern.ch/record/1049921
work_keys_str_mv AT fontainejeancharles productionofthecmstrackerendcapsubstructures