Production of the CMS Tracker End Cap sub-structures
The production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/j.nima.2007.07.129 http://cds.cern.ch/record/1049921 |
_version_ | 1780912843313381376 |
---|---|
author | Fontaine, Jean-Charles |
author_facet | Fontaine, Jean-Charles |
author_sort | Fontaine, Jean-Charles |
collection | CERN |
description | The production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes all over Europe, will then be explained. The petal assembly and testing procedure will be quickly described. The quality assurance put in place at each production step has resulted in a very high petal quality, as some overall plots will attest. Finally some details about part failures will be given. |
id | cern-1049921 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10499212019-09-30T06:29:59Zdoi:10.1016/j.nima.2007.07.129http://cds.cern.ch/record/1049921engFontaine, Jean-CharlesProduction of the CMS Tracker End Cap sub-structuresDetectors and Experimental TechniquesThe production and qualification of the 288 petals needed to build both CMS Tracker End Caps (TECs) is summarized. There will be first a description of a petal, integrating many components, the most important ones being the silicon modules. The organization of the production, involving 7 Institutes all over Europe, will then be explained. The petal assembly and testing procedure will be quickly described. The quality assurance put in place at each production step has resulted in a very high petal quality, as some overall plots will attest. Finally some details about part failures will be given.CMS-CR-2007-030oai:cds.cern.ch:10499212007-02-28 |
spellingShingle | Detectors and Experimental Techniques Fontaine, Jean-Charles Production of the CMS Tracker End Cap sub-structures |
title | Production of the CMS Tracker End Cap sub-structures |
title_full | Production of the CMS Tracker End Cap sub-structures |
title_fullStr | Production of the CMS Tracker End Cap sub-structures |
title_full_unstemmed | Production of the CMS Tracker End Cap sub-structures |
title_short | Production of the CMS Tracker End Cap sub-structures |
title_sort | production of the cms tracker end cap sub-structures |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1016/j.nima.2007.07.129 http://cds.cern.ch/record/1049921 |
work_keys_str_mv | AT fontainejeancharles productionofthecmstrackerendcapsubstructures |