Cargando…
High Intensity Commissioning of the SPS LSS4 extraction for CNGS
The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino project (CNGS). CNGS requires 2 fast extractions of 10.5 microsecond long batches, 50 milliseconds apart. Each batch will consist of 2.4 × 10<sup>13 </sup>protons at 40...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1053099 |
_version_ | 1780912939537006592 |
---|---|
author | Kain, V Carlier, E Gaxiola, E Goddard, B Gschwendtner, E Gourber-Pace, M Meddahi, M Vincke, H Vincke, H H Wenninger, J |
author_facet | Kain, V Carlier, E Gaxiola, E Goddard, B Gschwendtner, E Gourber-Pace, M Meddahi, M Vincke, H Vincke, H H Wenninger, J |
author_sort | Kain, V |
collection | CERN |
description | The SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino project (CNGS). CNGS requires 2 fast extractions of 10.5 microsecond long batches, 50 milliseconds apart. Each batch will consist of 2.4 × 10<sup>13 </sup>protons at 400 GeV. These intensities are factor of 10 above the equipment damage limit in case of beam loss. Active (interlock system) and passive protection systems have to be in place to guarantee safe operation and to respect the radiation limits in zones close to the extraction region. In summer 2006 CNGS was commissioned including extraction with high intensity. A thorough setting-up of the CNGS extraction was carried out as part of the CNGS commissioning, including aperture and beam loss measurements, and defining and checking of interlock thresholds for extraction trajectory, beam loss monitors and radiation monitors. The relevant systems and risks are introduced in this paper, the commissioning results are summarised and comparisons with simulation predictions are presented. |
id | cern-1053099 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10530992019-09-30T06:29:59Zhttp://cds.cern.ch/record/1053099engKain, VCarlier, EGaxiola, EGoddard, BGschwendtner, EGourber-Pace, MMeddahi, MVincke, HVincke, H HWenninger, JHigh Intensity Commissioning of the SPS LSS4 extraction for CNGSAccelerators and Storage RingsThe SPS LSS4 fast extraction system will serve both the anti-clockwise ring of the LHC and the CERN Gran Sasso Neutrino project (CNGS). CNGS requires 2 fast extractions of 10.5 microsecond long batches, 50 milliseconds apart. Each batch will consist of 2.4 × 10<sup>13 </sup>protons at 400 GeV. These intensities are factor of 10 above the equipment damage limit in case of beam loss. Active (interlock system) and passive protection systems have to be in place to guarantee safe operation and to respect the radiation limits in zones close to the extraction region. In summer 2006 CNGS was commissioned including extraction with high intensity. A thorough setting-up of the CNGS extraction was carried out as part of the CNGS commissioning, including aperture and beam loss measurements, and defining and checking of interlock thresholds for extraction trajectory, beam loss monitors and radiation monitors. The relevant systems and risks are introduced in this paper, the commissioning results are summarised and comparisons with simulation predictions are presented.CERN-AB-2007-048oai:cds.cern.ch:10530992007 |
spellingShingle | Accelerators and Storage Rings Kain, V Carlier, E Gaxiola, E Goddard, B Gschwendtner, E Gourber-Pace, M Meddahi, M Vincke, H Vincke, H H Wenninger, J High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title | High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title_full | High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title_fullStr | High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title_full_unstemmed | High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title_short | High Intensity Commissioning of the SPS LSS4 extraction for CNGS |
title_sort | high intensity commissioning of the sps lss4 extraction for cngs |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1053099 |
work_keys_str_mv | AT kainv highintensitycommissioningofthespslss4extractionforcngs AT carliere highintensitycommissioningofthespslss4extractionforcngs AT gaxiolae highintensitycommissioningofthespslss4extractionforcngs AT goddardb highintensitycommissioningofthespslss4extractionforcngs AT gschwendtnere highintensitycommissioningofthespslss4extractionforcngs AT gourberpacem highintensitycommissioningofthespslss4extractionforcngs AT meddahim highintensitycommissioningofthespslss4extractionforcngs AT vinckeh highintensitycommissioningofthespslss4extractionforcngs AT vinckehh highintensitycommissioningofthespslss4extractionforcngs AT wenningerj highintensitycommissioningofthespslss4extractionforcngs |