Cargando…
Design of the Modulator the CTF3 Tail Clipper Kicker
The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted beam from the combiner ring (CR), of 35 A in magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX) facility. A Tail Clipper...
Autores principales: | Barnes, M J, Fowler, T, Ravida, G, Ueda, A |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1055560 |
Ejemplares similares
-
Design of the modulator for the CTF3 tail clipper kicker
por: Barnes, M J, et al.
Publicado: (2007) -
Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker
por: Barnes, M J, et al.
Publicado: (2009) -
Design, Manufacturing and Testing of the CTF3 Tail Clipper Kicker
por: Barnes, M J, et al.
Publicado: (2010) -
Tail clipper Linac
por: Cyvoct, G
Publicado: (1992) -
Detailed design, manufacturing and testing of a strip-line extraction kicker for CTF3 combiner ring
por: Rodriguez, I, et al.
Publicado: (2008)