CTF3 Combiner Ring Commissioning

The CLIC Test Facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current 'drive beam' that serves as the power source for the ac...

Descripción completa

Detalles Bibliográficos
Autores principales: Tecker, F, Biscari, C, Bressi, E, Corsini, R, Döbert, S, Ferrari, A, Ghigo, A, Skowronski, P, Urschütz, P
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1055561
_version_ 1780913038635827200
author Tecker, F
Biscari, C
Bressi, E
Corsini, R
Döbert, S
Ferrari, A
Ghigo, A
Skowronski, P
Urschütz, P
author_facet Tecker, F
Biscari, C
Bressi, E
Corsini, R
Döbert, S
Ferrari, A
Ghigo, A
Skowronski, P
Urschütz, P
author_sort Tecker, F
collection CERN
description The CLIC Test Facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current 'drive beam' that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented.
id cern-1055561
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10555612023-07-20T15:04:08Zhttp://cds.cern.ch/record/1055561engTecker, FBiscari, CBressi, ECorsini, RDöbert, SFerrari, AGhigo, ASkowronski, PUrschütz, PCTF3 Combiner Ring CommissioningAccelerators and Storage RingsThe CLIC Test Facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current 'drive beam' that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented.CERN-AB-2007-056CLIC-Note-718oai:cds.cern.ch:10555612007
spellingShingle Accelerators and Storage Rings
Tecker, F
Biscari, C
Bressi, E
Corsini, R
Döbert, S
Ferrari, A
Ghigo, A
Skowronski, P
Urschütz, P
CTF3 Combiner Ring Commissioning
title CTF3 Combiner Ring Commissioning
title_full CTF3 Combiner Ring Commissioning
title_fullStr CTF3 Combiner Ring Commissioning
title_full_unstemmed CTF3 Combiner Ring Commissioning
title_short CTF3 Combiner Ring Commissioning
title_sort ctf3 combiner ring commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1055561
work_keys_str_mv AT teckerf ctf3combinerringcommissioning
AT biscaric ctf3combinerringcommissioning
AT bressie ctf3combinerringcommissioning
AT corsinir ctf3combinerringcommissioning
AT doberts ctf3combinerringcommissioning
AT ferraria ctf3combinerringcommissioning
AT ghigoa ctf3combinerringcommissioning
AT skowronskip ctf3combinerringcommissioning
AT urschutzp ctf3combinerringcommissioning