Cargando…

Results on CLIC Proof of Principle from CTF3

The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme of multi-TeV electron-positron collider by 2010. CTF3 consists of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The instal...

Descripción completa

Detalles Bibliográficos
Autor principal: Corsini, R
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1055566
_version_ 1780913039725297664
author Corsini, R
author_facet Corsini, R
author_sort Corsini, R
collection CERN
description The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme of multi-TeV electron-positron collider by 2010. CTF3 consists of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation will include in its final configuration a two-beam test stand and a test decelerator. The linac and delay loop have been already commissioned, while the combiner ring has been completed by the first half of 2007. High gradient testing of accelerating structures is also under way. The status of the facility, the experimental results obtained and the future plans will be presented.
id cern-1055566
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10555662023-07-20T15:03:47Zhttp://cds.cern.ch/record/1055566engCorsini, RResults on CLIC Proof of Principle from CTF3Accelerators and Storage RingsThe CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme of multi-TeV electron-positron collider by 2010. CTF3 consists of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation will include in its final configuration a two-beam test stand and a test decelerator. The linac and delay loop have been already commissioned, while the combiner ring has been completed by the first half of 2007. High gradient testing of accelerating structures is also under way. The status of the facility, the experimental results obtained and the future plans will be presented.CERN-AB-2007-061CLIC-Note-712oai:cds.cern.ch:10555662007
spellingShingle Accelerators and Storage Rings
Corsini, R
Results on CLIC Proof of Principle from CTF3
title Results on CLIC Proof of Principle from CTF3
title_full Results on CLIC Proof of Principle from CTF3
title_fullStr Results on CLIC Proof of Principle from CTF3
title_full_unstemmed Results on CLIC Proof of Principle from CTF3
title_short Results on CLIC Proof of Principle from CTF3
title_sort results on clic proof of principle from ctf3
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1055566
work_keys_str_mv AT corsinir resultsonclicproofofprinciplefromctf3