Scenarios for Beam Commissioning of the LHC collimation system
A system of collimators has been designed to protect the superconducting LHC magnets against quench and damage from the high intensity proton beams. The considerable number of collimators and the resulting number of degrees of freedom for their set-up require a well prepared commissioning strategy....
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1056681 |
_version_ | 1780913084313894912 |
---|---|
author | Bracco, C Assmann, R W Redaelli, S Robert-Demolaize, R |
author_facet | Bracco, C Assmann, R W Redaelli, S Robert-Demolaize, R |
author_sort | Bracco, C |
collection | CERN |
description | A system of collimators has been designed to protect the superconducting LHC magnets against quench and damage from the high intensity proton beams. The considerable number of collimators and the resulting number of degrees of freedom for their set-up require a well prepared commissioning strategy. Efficiency studies for various implementations of the LHC collimation system have been performed, taking into account the evolution in optics and beam intensity according to the LHC commissioning schedule. This paper explains the present plans for the setup sequence of collimators. |
id | cern-1056681 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10566812023-05-31T13:24:33Zhttp://cds.cern.ch/record/1056681engBracco, CAssmann, R WRedaelli, SRobert-Demolaize, RScenarios for Beam Commissioning of the LHC collimation systemAccelerators and Storage RingsA system of collimators has been designed to protect the superconducting LHC magnets against quench and damage from the high intensity proton beams. The considerable number of collimators and the resulting number of degrees of freedom for their set-up require a well prepared commissioning strategy. Efficiency studies for various implementations of the LHC collimation system have been performed, taking into account the evolution in optics and beam intensity according to the LHC commissioning schedule. This paper explains the present plans for the setup sequence of collimators.LHC-PROJECT-Report-1013CERN-LHC-PROJECT-Report-1013oai:cds.cern.ch:10566812007 |
spellingShingle | Accelerators and Storage Rings Bracco, C Assmann, R W Redaelli, S Robert-Demolaize, R Scenarios for Beam Commissioning of the LHC collimation system |
title | Scenarios for Beam Commissioning of the LHC collimation system |
title_full | Scenarios for Beam Commissioning of the LHC collimation system |
title_fullStr | Scenarios for Beam Commissioning of the LHC collimation system |
title_full_unstemmed | Scenarios for Beam Commissioning of the LHC collimation system |
title_short | Scenarios for Beam Commissioning of the LHC collimation system |
title_sort | scenarios for beam commissioning of the lhc collimation system |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1056681 |
work_keys_str_mv | AT braccoc scenariosforbeamcommissioningofthelhccollimationsystem AT assmannrw scenariosforbeamcommissioningofthelhccollimationsystem AT redaellis scenariosforbeamcommissioningofthelhccollimationsystem AT robertdemolaizer scenariosforbeamcommissioningofthelhccollimationsystem |