High-precision performance testing of the LHC power converters
The magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10-6) required by LHC. One consequence of this a...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1058541 |
_version_ | 1780913133242548224 |
---|---|
author | Bastos, M Cantone, A Dreesen, P Fernqvist, G Fournier, O Hudson, G |
author_facet | Bastos, M Cantone, A Dreesen, P Fernqvist, G Fournier, O Hudson, G |
author_sort | Bastos, M |
collection | CERN |
description | The magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10-6) required by LHC. One consequence of this approach was several stages of system tests: factory reception tests, CERN reception tests, integration tests , short-circuit tests and commissioning on the final load in the LHC tunnel. The majority of the power converters for LHC have now been delivered, integrated into complete converter and high-precision performance testing is well advanced. This paper presents the techniques used for high-precision testing and the results obtained. |
id | cern-1058541 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10585412023-05-31T13:21:18Zhttp://cds.cern.ch/record/1058541engBastos, MCantone, ADreesen, PFernqvist, GFournier, OHudson, GHigh-precision performance testing of the LHC power convertersAccelerators and Storage RingsThe magnet power converters for LHC were procured in three parts, power part, current transducers and control electronics, to enable a maximum of industrial participation in the manufacturing and still guarantee the very high precision (a few parts in 10-6) required by LHC. One consequence of this approach was several stages of system tests: factory reception tests, CERN reception tests, integration tests , short-circuit tests and commissioning on the final load in the LHC tunnel. The majority of the power converters for LHC have now been delivered, integrated into complete converter and high-precision performance testing is well advanced. This paper presents the techniques used for high-precision testing and the results obtained.LHC-PROJECT-Report-1046CERN-LHC-PROJECT-Report-1046oai:cds.cern.ch:10585412007 |
spellingShingle | Accelerators and Storage Rings Bastos, M Cantone, A Dreesen, P Fernqvist, G Fournier, O Hudson, G High-precision performance testing of the LHC power converters |
title | High-precision performance testing of the LHC power converters |
title_full | High-precision performance testing of the LHC power converters |
title_fullStr | High-precision performance testing of the LHC power converters |
title_full_unstemmed | High-precision performance testing of the LHC power converters |
title_short | High-precision performance testing of the LHC power converters |
title_sort | high-precision performance testing of the lhc power converters |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1058541 |
work_keys_str_mv | AT bastosm highprecisionperformancetestingofthelhcpowerconverters AT cantonea highprecisionperformancetestingofthelhcpowerconverters AT dreesenp highprecisionperformancetestingofthelhcpowerconverters AT fernqvistg highprecisionperformancetestingofthelhcpowerconverters AT fourniero highprecisionperformancetestingofthelhcpowerconverters AT hudsong highprecisionperformancetestingofthelhcpowerconverters |