Cargando…

The LHC Collimator Controls Architecture - Design and beam tests

The LHC collimation system will require simultaneous management by the LHC control system of more than 500 jaw positioning mechanisms in order to ensure the required beam cleaning and machine protection performance in all machine phases, from injection at 450 GeV to collision at 7 TeV. Each jaw posi...

Descripción completa

Detalles Bibliográficos
Autores principales: Redaelli, S, Assmann, Ralph Wolfgang, Gander, P, Jonker, M, Lamont, M, Losito, R, Masi, A, Sobczak, M
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1058822

Ejemplares similares