Cargando…

Plans for Upgrading the CERN Proton Accelerator Complex

With the construction of the Large Hadron Collider (LHC) in its final phase at CERN, it is now time to prepare for increasing its performance as much as possible and for preparing for the future needs of physics. A basic plan has been proposed by the working group on "Proton Accelerators of the...

Descripción completa

Detalles Bibliográficos
Autor principal: Garoby, R
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:https://dx.doi.org/10.1088/1742-6596/110/11/112003
http://cds.cern.ch/record/1059338
_version_ 1780913144245256192
author Garoby, R
author_facet Garoby, R
author_sort Garoby, R
collection CERN
description With the construction of the Large Hadron Collider (LHC) in its final phase at CERN, it is now time to prepare for increasing its performance as much as possible and for preparing for the future needs of physics. A basic plan has been proposed by the working group on "Proton Accelerators of the Future", using the input from an ad'hoc physics working group looking after "Physics Opportunities with Future Proton Accelerators". Apart from upgrades in the LHC itself, mainly in the optics of the insertions, the proposal is to renew the injector complex and significantly improve its characteristics. In a first phase, a new 160 MeV H- linac (Linac4) will be built to replace the present 50 MeV proton linac (Linac2) and extensive consolidation will be made. In a second phase, the present 26 GeV PS and its set of injectors (Linac2 + PSB) are planned to be replaced with a ~50 GeV synchrotron (PS2) with a ~4 GeV superconducting proton linac (SPL) as injector. The SPS itself will be upgraded for injection at 50 GeV and for better performance with high brightness beams. These proposals will be described as well as their potential for other uses like a neutrino facility.
id cern-1059338
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10593382022-08-17T13:34:47Zdoi:10.1088/1742-6596/110/11/112003http://cds.cern.ch/record/1059338engGaroby, RPlans for Upgrading the CERN Proton Accelerator ComplexAccelerators and Storage RingsWith the construction of the Large Hadron Collider (LHC) in its final phase at CERN, it is now time to prepare for increasing its performance as much as possible and for preparing for the future needs of physics. A basic plan has been proposed by the working group on "Proton Accelerators of the Future", using the input from an ad'hoc physics working group looking after "Physics Opportunities with Future Proton Accelerators". Apart from upgrades in the LHC itself, mainly in the optics of the insertions, the proposal is to renew the injector complex and significantly improve its characteristics. In a first phase, a new 160 MeV H- linac (Linac4) will be built to replace the present 50 MeV proton linac (Linac2) and extensive consolidation will be made. In a second phase, the present 26 GeV PS and its set of injectors (Linac2 + PSB) are planned to be replaced with a ~50 GeV synchrotron (PS2) with a ~4 GeV superconducting proton linac (SPL) as injector. The SPS itself will be upgraded for injection at 50 GeV and for better performance with high brightness beams. These proposals will be described as well as their potential for other uses like a neutrino facility.CERN-AB-2007-074-PAFoai:cds.cern.ch:10593382007
spellingShingle Accelerators and Storage Rings
Garoby, R
Plans for Upgrading the CERN Proton Accelerator Complex
title Plans for Upgrading the CERN Proton Accelerator Complex
title_full Plans for Upgrading the CERN Proton Accelerator Complex
title_fullStr Plans for Upgrading the CERN Proton Accelerator Complex
title_full_unstemmed Plans for Upgrading the CERN Proton Accelerator Complex
title_short Plans for Upgrading the CERN Proton Accelerator Complex
title_sort plans for upgrading the cern proton accelerator complex
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1088/1742-6596/110/11/112003
http://cds.cern.ch/record/1059338
work_keys_str_mv AT garobyr plansforupgradingthecernprotonacceleratorcomplex