Cargando…
VELO Module Production - Cable and Clamp Attachment
This note describes in detail the procedures used in the fixing of the clamps to hold the cables in position on the pedestal in the final module assembly for the LHCb VELO detector modules. It summarizes the effects on the module of applying the cables.
Autor principal: | Smith, N A |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1067142 |
Ejemplares similares
-
VELO Module Production - Cable Testing
por: Southern, G, et al.
Publicado: (2007) -
VELO Module Production - Module Assembly
por: Carroll, J L, et al.
Publicado: (2007) -
VELO Module Production â Pre-Assembly Hybrid Testing
por: Smith, N A, et al.
Publicado: (2008) -
VELO Module Production - Module Electrical Tests
por: Huse, T
Publicado: (2007) -
VELO Module Production - Final Module Metrology
por: Sutcliffe, P
Publicado: (2008)