Cargando…

Schedule evolution during the life-time of the LHC project

The Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical...

Descripción completa

Detalles Bibliográficos
Autores principales: Foraz, K, Barbero-Soto, E, Gaillard, H, Hauviller, Claude, Weisz, S
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:https://dx.doi.org/10.1109/PAC.2007.4440833
http://cds.cern.ch/record/1067497
_version_ 1780913299814088704
author Foraz, K
Barbero-Soto, E
Gaillard, H
Hauviller, Claude
Weisz, S
author_facet Foraz, K
Barbero-Soto, E
Gaillard, H
Hauviller, Claude
Weisz, S
author_sort Foraz, K
collection CERN
description The Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical development, procurement, logistics and organization) have impacted on the schedule evolution through the lifetime of the project. It describes the cause effect analysis of the major rescheduling that occurred during the installation of the LHC and presents some general conclusions potentially applicable in other projects.
id cern-1067497
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10674972019-09-30T06:29:59Zdoi:10.1109/PAC.2007.4440833http://cds.cern.ch/record/1067497engForaz, KBarbero-Soto, EGaillard, HHauviller, ClaudeWeisz, SSchedule evolution during the life-time of the LHC projectAccelerators and Storage RingsThe Large Hadron Collider Project was approved by the CERN Council in December 1994. The CERN management opted from the beginning of the project for a very aggressive installation planning based on a just-in-time sequencing of all activities. This paper aims to draw how different factors (technical development, procurement, logistics and organization) have impacted on the schedule evolution through the lifetime of the project. It describes the cause effect analysis of the major rescheduling that occurred during the installation of the LHC and presents some general conclusions potentially applicable in other projects.CERN-TS-2007-001oai:cds.cern.ch:10674972007-06-15
spellingShingle Accelerators and Storage Rings
Foraz, K
Barbero-Soto, E
Gaillard, H
Hauviller, Claude
Weisz, S
Schedule evolution during the life-time of the LHC project
title Schedule evolution during the life-time of the LHC project
title_full Schedule evolution during the life-time of the LHC project
title_fullStr Schedule evolution during the life-time of the LHC project
title_full_unstemmed Schedule evolution during the life-time of the LHC project
title_short Schedule evolution during the life-time of the LHC project
title_sort schedule evolution during the life-time of the lhc project
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/PAC.2007.4440833
http://cds.cern.ch/record/1067497
work_keys_str_mv AT forazk scheduleevolutionduringthelifetimeofthelhcproject
AT barberosotoe scheduleevolutionduringthelifetimeofthelhcproject
AT gaillardh scheduleevolutionduringthelifetimeofthelhcproject
AT hauvillerclaude scheduleevolutionduringthelifetimeofthelhcproject
AT weiszs scheduleevolutionduringthelifetimeofthelhcproject