Transport and installation of the LHC cryo-magnets
Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted availabl...
Autores principales: | , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/PAC.2007.4440193 http://cds.cern.ch/record/1067500 |
_version_ | 1780913300456865792 |
---|---|
author | Artoos, K Bartolome-Jimenez, S Capatina, O Chevalley, JM Foraz, K Guinchard, M Hauviller, Claude Kershaw, K Prodon, S Rühl, Ingo Trinquart, G Weisz, S Ponsot, P |
author_facet | Artoos, K Bartolome-Jimenez, S Capatina, O Chevalley, JM Foraz, K Guinchard, M Hauviller, Claude Kershaw, K Prodon, S Rühl, Ingo Trinquart, G Weisz, S Ponsot, P |
author_sort | Artoos, K |
collection | CERN |
description | Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted available space. The size and complexity of the project involved challenges in the field of equipment design and manufacturing, maintenance, training and follow-up of operators and logistics. The paper presents the milestones, problems to be overcome and lessons learned during this project. |
id | cern-1067500 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10675002019-09-30T06:29:59Zdoi:10.1109/PAC.2007.4440193http://cds.cern.ch/record/1067500engArtoos, KBartolome-Jimenez, SCapatina, OChevalley, JMForaz, KGuinchard, MHauviller, ClaudeKershaw, KProdon, SRühl, IngoTrinquart, GWeisz, SPonsot, PTransport and installation of the LHC cryo-magnetsAccelerators and Storage RingsEleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted available space. The size and complexity of the project involved challenges in the field of equipment design and manufacturing, maintenance, training and follow-up of operators and logistics. The paper presents the milestones, problems to be overcome and lessons learned during this project.CERN-TS-2007-004oai:cds.cern.ch:10675002007-06-15 |
spellingShingle | Accelerators and Storage Rings Artoos, K Bartolome-Jimenez, S Capatina, O Chevalley, JM Foraz, K Guinchard, M Hauviller, Claude Kershaw, K Prodon, S Rühl, Ingo Trinquart, G Weisz, S Ponsot, P Transport and installation of the LHC cryo-magnets |
title | Transport and installation of the LHC cryo-magnets |
title_full | Transport and installation of the LHC cryo-magnets |
title_fullStr | Transport and installation of the LHC cryo-magnets |
title_full_unstemmed | Transport and installation of the LHC cryo-magnets |
title_short | Transport and installation of the LHC cryo-magnets |
title_sort | transport and installation of the lhc cryo-magnets |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/PAC.2007.4440193 http://cds.cern.ch/record/1067500 |
work_keys_str_mv | AT artoosk transportandinstallationofthelhccryomagnets AT bartolomejimenezs transportandinstallationofthelhccryomagnets AT capatinao transportandinstallationofthelhccryomagnets AT chevalleyjm transportandinstallationofthelhccryomagnets AT forazk transportandinstallationofthelhccryomagnets AT guinchardm transportandinstallationofthelhccryomagnets AT hauvillerclaude transportandinstallationofthelhccryomagnets AT kershawk transportandinstallationofthelhccryomagnets AT prodons transportandinstallationofthelhccryomagnets AT ruhlingo transportandinstallationofthelhccryomagnets AT trinquartg transportandinstallationofthelhccryomagnets AT weiszs transportandinstallationofthelhccryomagnets AT ponsotp transportandinstallationofthelhccryomagnets |