Transport and installation of the LHC cryo-magnets
Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted availabl...
Autores principales: | Artoos, K, Bartolome-Jimenez, S, Capatina, O, Chevalley, JM, Foraz, K, Guinchard, M, Hauviller, Claude, Kershaw, K, Prodon, S, Rühl, Ingo, Trinquart, G, Weisz, S, Ponsot, P |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/PAC.2007.4440193 http://cds.cern.ch/record/1067500 |
Ejemplares similares
-
Equipment for tunnel installation of main and insertion LHC cryo-magnet
por: Artoos, Kurt, et al.
Publicado: (2006) -
TRANSPORT AND INSTALLATION OF CRYO-MAGNETS IN CERN'S LARGE HADRON COLLIDER TUNNEL
por: Artoos, K, et al.
Publicado: (2004) -
Overview of the Large Hadron Collider cryo-magnets logistics
por: Capatina, O, et al.
Publicado: (2006) -
Transport and Installation of Cryo-magnets in CERN's Large Hadron Collider Tunnel
por: Kershaw, Keith, et al.
Publicado: (2004) -
Mechanical Dynamic Analysis of the LHC ARC Cryo-magnets
por: Capatina, O, et al.
Publicado: (2003)