Cargando…
Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring ar...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1068141 |
_version_ | 1780913316504272896 |
---|---|
author | Weisz, S Barbero-Soto, E Foraz, K Rodríguez-Mateos, F |
author_facet | Weisz, S Barbero-Soto, E Foraz, K Rodríguez-Mateos, F |
author_sort | Weisz, S |
collection | CERN |
description | The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests. |
id | cern-1068141 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
record_format | invenio |
spelling | cern-10681412022-08-17T13:35:55Zhttp://cds.cern.ch/record/1068141engWeisz, SBarbero-Soto, EForaz, KRodríguez-Mateos, FPlanning and Logistics Issues raised by the Individual System Tests during the Installation of the LHCAccelerators and Storage RingsThe running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.CERN-TS-2006-008oai:cds.cern.ch:10681412006-06-15 |
spellingShingle | Accelerators and Storage Rings Weisz, S Barbero-Soto, E Foraz, K Rodríguez-Mateos, F Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title | Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title_full | Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title_fullStr | Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title_full_unstemmed | Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title_short | Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC |
title_sort | planning and logistics issues raised by the individual system tests during the installation of the lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1068141 |
work_keys_str_mv | AT weiszs planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc AT barberosotoe planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc AT forazk planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc AT rodriguezmateosf planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc |