Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC

The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring ar...

Descripción completa

Detalles Bibliográficos
Autores principales: Weisz, S, Barbero-Soto, E, Foraz, K, Rodríguez-Mateos, F
Lenguaje:eng
Publicado: 2006
Materias:
Acceso en línea:http://cds.cern.ch/record/1068141
_version_ 1780913316504272896
author Weisz, S
Barbero-Soto, E
Foraz, K
Rodríguez-Mateos, F
author_facet Weisz, S
Barbero-Soto, E
Foraz, K
Rodríguez-Mateos, F
author_sort Weisz, S
collection CERN
description The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.
id cern-1068141
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2006
record_format invenio
spelling cern-10681412022-08-17T13:35:55Zhttp://cds.cern.ch/record/1068141engWeisz, SBarbero-Soto, EForaz, KRodríguez-Mateos, FPlanning and Logistics Issues raised by the Individual System Tests during the Installation of the LHCAccelerators and Storage RingsThe running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.CERN-TS-2006-008oai:cds.cern.ch:10681412006-06-15
spellingShingle Accelerators and Storage Rings
Weisz, S
Barbero-Soto, E
Foraz, K
Rodríguez-Mateos, F
Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title_full Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title_fullStr Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title_full_unstemmed Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title_short Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC
title_sort planning and logistics issues raised by the individual system tests during the installation of the lhc
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1068141
work_keys_str_mv AT weiszs planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc
AT barberosotoe planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc
AT forazk planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc
AT rodriguezmateosf planningandlogisticsissuesraisedbytheindividualsystemtestsduringtheinstallationofthelhc