How to fill a narrow 27 KM long tube with a huge number of accelerator components?
As in large scale industrial projects, research projects, such as giant and complex particle accelerators, require intensive spatial integration studies using 3D CAD models, from the design to the installation phases. The future management of the LHC machine configuration during its operation will r...
Autores principales: | Muttoni, Y, Corso, J P, Valbuena, R |
---|---|
Lenguaje: | eng |
Publicado: |
2005
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1068285 |
Ejemplares similares
-
How to Fill a Narrow 27 km Long Tube with a Huge Number of Accelerator Components?
por: Muttoni, Yvon, et al.
Publicado: (2005) -
27 km vacuum system for the Large Electron Positron storage ring
por: Gröbner, Oswald
Publicado: (1985) -
A 3D texture dataset of 27 km road
por: Kane, Malal
Publicado: (2021) -
Control of the Geometrical Conformity of the LHC Installation with a Single Laser Source
por: Corso, JP, et al.
Publicado: (2006) -
Numbering of drift-tubes and polarity of magnets
por: Hereward, H G
Publicado: (1957)