Cargando…
The CMS-HF Forward Calorimeter Commissioning
The CMS HF Calorimeter was the first detector to be lowered into the cavern at UX5. It was placed in the garage position during the lowering of the rest of the big CMS pieces. The commissioning of the hardware parts is continuing. Especially, integrating the HF and completing the monitoring systems,...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1142/9789812819093_0057 http://cds.cern.ch/record/1073705 |
_version_ | 1780913430960537600 |
---|---|
author | Gülmez, E |
author_facet | Gülmez, E |
author_sort | Gülmez, E |
collection | CERN |
description | The CMS HF Calorimeter was the first detector to be lowered into the cavern at UX5. It was placed in the garage position during the lowering of the rest of the big CMS pieces. The commissioning of the hardware parts is continuing. Especially, integrating the HF and completing the monitoring systems, such as, online laser, LED and radioactive source monitoring. Also a special monitor system for the radiation damage (raddam) of the quartz fibers is being implemented. Calibration measurements of the calorimeter had started already even before the lowering. Progress in the calibration work and current plans for the HF calorimeter during the low luminosity run will be summarized. |
id | cern-1073705 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10737052019-09-30T06:29:59Zdoi:10.1142/9789812819093_0057http://cds.cern.ch/record/1073705engGülmez, EThe CMS-HF Forward Calorimeter CommissioningDetectors and Experimental TechniquesThe CMS HF Calorimeter was the first detector to be lowered into the cavern at UX5. It was placed in the garage position during the lowering of the rest of the big CMS pieces. The commissioning of the hardware parts is continuing. Especially, integrating the HF and completing the monitoring systems, such as, online laser, LED and radioactive source monitoring. Also a special monitor system for the radiation damage (raddam) of the quartz fibers is being implemented. Calibration measurements of the calorimeter had started already even before the lowering. Progress in the calibration work and current plans for the HF calorimeter during the low luminosity run will be summarized.CMS-CR-2007-071oai:cds.cern.ch:10737052007-11-12 |
spellingShingle | Detectors and Experimental Techniques Gülmez, E The CMS-HF Forward Calorimeter Commissioning |
title | The CMS-HF Forward Calorimeter Commissioning |
title_full | The CMS-HF Forward Calorimeter Commissioning |
title_fullStr | The CMS-HF Forward Calorimeter Commissioning |
title_full_unstemmed | The CMS-HF Forward Calorimeter Commissioning |
title_short | The CMS-HF Forward Calorimeter Commissioning |
title_sort | cms-hf forward calorimeter commissioning |
topic | Detectors and Experimental Techniques |
url | https://dx.doi.org/10.1142/9789812819093_0057 http://cds.cern.ch/record/1073705 |
work_keys_str_mv | AT gulmeze thecmshfforwardcalorimetercommissioning AT gulmeze cmshfforwardcalorimetercommissioning |