Cargando…

Commissioning of the LHC

The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN...

Descripción completa

Detalles Bibliográficos
Autor principal: Evans, Lyndon R
Lenguaje:eng
Publicado: 2007
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/1076769
_version_ 1780913472557547520
author Evans, Lyndon R
author_facet Evans, Lyndon R
author_sort Evans, Lyndon R
collection CERN
description The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.
id cern-1076769
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10767692022-11-02T22:20:17Zhttp://cds.cern.ch/record/1076769engEvans, Lyndon RCommissioning of the LHCXXThe LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.oai:cds.cern.ch:10767692007-09-13
spellingShingle XX
Evans, Lyndon R
Commissioning of the LHC
title Commissioning of the LHC
title_full Commissioning of the LHC
title_fullStr Commissioning of the LHC
title_full_unstemmed Commissioning of the LHC
title_short Commissioning of the LHC
title_sort commissioning of the lhc
topic XX
url http://cds.cern.ch/record/1076769
work_keys_str_mv AT evanslyndonr commissioningofthelhc