Cargando…
Commissioning of the LHC
The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN...
Autor principal: | Evans, Lyndon R |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1076769 |
Ejemplares similares
-
LHC: Construction and Commissioning Status
por: Evans, Lyndon R
Publicado: (2007) -
The LHC project
por: Evans, Lyndon R
Publicado: (2002) -
Commissioning of Particle ID with Early LHC Data
por: Hrynóva, T
Publicado: (2008) -
General CERN and LHC matters. MoU -LHCC -Goals of this overview week Status of the experimental area - The LHC Machine - short general status - critical technical issues
por: Jenni, Peter, et al.
Publicado: (1998) -
Commissioning and startup of the LHC accelerator
por: Evans, L
Publicado: (2008)