Cargando…
CLIC and CTF3
The CLIC study has been exploring the scheme for an electron-positron Collider (CLIC) with high luminosity (10$^{34}$ - 10$^{35}$ cm2/s) and a nominal centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The CLIC Test Facility CTF3, built at CERN by an internat...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/110/11/112005 http://cds.cern.ch/record/1080561 |
_version_ | 1780913522688917504 |
---|---|
author | Tecker, F |
author_facet | Tecker, F |
author_sort | Tecker, F |
collection | CERN |
description | The CLIC study has been exploring the scheme for an electron-positron Collider (CLIC) with high luminosity (10$^{34}$ - 10$^{35}$ cm2/s) and a nominal centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme by 2010. CTF3 consists of a 150 MeV electron linac followed by a 42 m long delay loop and an 84 m combiner ring, followed by a two-beam test stand and a test decelerator. The linac and delay loop have been previously commissioned, while the combiner ring has been recently completed. After a presentation of the recent CLIC parameters, the status of the test facility, the experimental results achieved and the future plans will be presented. |
id | cern-1080561 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10805612023-07-20T15:05:13Zdoi:10.1088/1742-6596/110/11/112005http://cds.cern.ch/record/1080561engTecker, FCLIC and CTF3Accelerators and Storage RingsThe CLIC study has been exploring the scheme for an electron-positron Collider (CLIC) with high luminosity (10$^{34}$ - 10$^{35}$ cm2/s) and a nominal centre-of-mass energy of 3 TeV in order to make the multi-TeV range accessible for physics. The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme by 2010. CTF3 consists of a 150 MeV electron linac followed by a 42 m long delay loop and an 84 m combiner ring, followed by a two-beam test stand and a test decelerator. The linac and delay loop have been previously commissioned, while the combiner ring has been recently completed. After a presentation of the recent CLIC parameters, the status of the test facility, the experimental results achieved and the future plans will be presented.CERN-AB-2008-001CLIC-Note-730oai:cds.cern.ch:10805612007 |
spellingShingle | Accelerators and Storage Rings Tecker, F CLIC and CTF3 |
title | CLIC and CTF3 |
title_full | CLIC and CTF3 |
title_fullStr | CLIC and CTF3 |
title_full_unstemmed | CLIC and CTF3 |
title_short | CLIC and CTF3 |
title_sort | clic and ctf3 |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1088/1742-6596/110/11/112005 http://cds.cern.ch/record/1080561 |
work_keys_str_mv | AT teckerf clicandctf3 |