Cargando…
Trajectory Correction in the Transfer Line TT2-TT10 for the Continuous Transfer (CT)
A new scheme for the trajectory correction in the TT2-TT10 transfer line for the Continuous Transfer (CT) extraction from the PS to the SPS has been developed together with a new software application, PS-CT-Check. In this note the algorithm, the software, and the results of the tests performed durin...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1081105 |
Sumario: | A new scheme for the trajectory correction in the TT2-TT10 transfer line for the Continuous Transfer (CT) extraction from the PS to the SPS has been developed together with a new software application, PS-CT-Check. In this note the algorithm, the software, and the results of the tests performed during the 2007 run are summarized. The PS-CT-Check user's manual is also provided. The scheme, with minor modifications, will be applied to the new Multi-Turn Extraction (MTE). |
---|