Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8
This note presents first estimates of the static heat loads in the LHC arc cryostats, evaluated experimentally during the commissioning of sector 7-8 in April 2007. Heat loads to the thermal shielding are estimated from the non-isothermal cooling of the supercritical helium in line E, while heat loa...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1087253 |
_version_ | 1780913684602683392 |
---|---|
author | Maglioni, C Parma, V |
author_facet | Maglioni, C Parma, V |
author_sort | Maglioni, C |
collection | CERN |
description | This note presents first estimates of the static heat loads in the LHC arc cryostats, evaluated experimentally during the commissioning of sector 7-8 in April 2007. Heat loads to the thermal shielding are estimated from the non-isothermal cooling of the supercritical helium in line E, while heat loads to the 1.9K level of the cold masses are estimated from the internal energy balance during a natural warm-up of the sector in the absence of active cooling. A comparison of the measured heat loads with the budgeted heat loads is then presented and discussed. |
id | cern-1087253 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-10872532019-09-30T06:29:59Zhttp://cds.cern.ch/record/1087253engMaglioni, CParma, VAssessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8Accelerators and Storage RingsThis note presents first estimates of the static heat loads in the LHC arc cryostats, evaluated experimentally during the commissioning of sector 7-8 in April 2007. Heat loads to the thermal shielding are estimated from the non-isothermal cooling of the supercritical helium in line E, while heat loads to the 1.9K level of the cold masses are estimated from the internal energy balance during a natural warm-up of the sector in the absence of active cooling. A comparison of the measured heat loads with the budgeted heat loads is then presented and discussed.LHC-Project-note-409EDMS no: 890590CERN-LHC-Project-note-409oai:cds.cern.ch:10872532008-02-05 |
spellingShingle | Accelerators and Storage Rings Maglioni, C Parma, V Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title | Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title_full | Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title_fullStr | Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title_full_unstemmed | Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title_short | Assessment of Static Heat Loads in the LHC Arc, from the Commissioning of Sector 7-8 |
title_sort | assessment of static heat loads in the lhc arc, from the commissioning of sector 7-8 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1087253 |
work_keys_str_mv | AT maglionic assessmentofstaticheatloadsinthelhcarcfromthecommissioningofsector78 AT parmav assessmentofstaticheatloadsinthelhcarcfromthecommissioningofsector78 |