Cargando…
Installation and calibration of the new re-entrant BPM in the Flash LINAC
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CARE
2006
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1089241 |
_version_ | 1780913730625732608 |
---|---|
author | Simon, C Luong, M Chel, S Napoly, O Baboi, N Mildner, N Nölle, D Rouvière, N |
author_facet | Simon, C Luong, M Chel, S Napoly, O Baboi, N Mildner, N Nölle, D Rouvière, N |
author_sort | Simon, C |
collection | CERN |
id | cern-1089241 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2006 |
publisher | CARE |
record_format | invenio |
spelling | cern-10892412019-09-30T06:29:59Zhttp://cds.cern.ch/record/1089241engSimon, CLuong, MChel, SNapoly, OBaboi, NMildner, NNölle, DRouvière, NInstallation and calibration of the new re-entrant BPM in the Flash LINACAccelerators and Storage RingsCARECARE-Report-06-030-SRFCARE-Report-2006-030-SRFoai:cds.cern.ch:10892412006 |
spellingShingle | Accelerators and Storage Rings Simon, C Luong, M Chel, S Napoly, O Baboi, N Mildner, N Nölle, D Rouvière, N Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title | Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title_full | Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title_fullStr | Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title_full_unstemmed | Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title_short | Installation and calibration of the new re-entrant BPM in the Flash LINAC |
title_sort | installation and calibration of the new re-entrant bpm in the flash linac |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1089241 |
work_keys_str_mv | AT simonc installationandcalibrationofthenewreentrantbpmintheflashlinac AT luongm installationandcalibrationofthenewreentrantbpmintheflashlinac AT chels installationandcalibrationofthenewreentrantbpmintheflashlinac AT napolyo installationandcalibrationofthenewreentrantbpmintheflashlinac AT baboin installationandcalibrationofthenewreentrantbpmintheflashlinac AT mildnern installationandcalibrationofthenewreentrantbpmintheflashlinac AT nolled installationandcalibrationofthenewreentrantbpmintheflashlinac AT rouvieren installationandcalibrationofthenewreentrantbpmintheflashlinac |