Cargando…
ATLAS SCT Commissioning
The Barrel and End-Cap SCT detectors are installed in the ATLAS cavern. This paper will focus on the assembly, installation and first tests of the SCT in-situ. The thermal, electrical and optical services were tested and the results will be reviewed. Problems with the cooling have led to a modificat...
Autor principal: | Limper, Maaike |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-007.164 http://cds.cern.ch/record/1089260 |
Ejemplares similares
-
ATLAS SCT POWER SUPPLY SYSTEM
por: Phillips, P W
Publicado: (2007) -
ATLAS SCT Commissioning – TWEPP-08
por: Magrath, C A
Publicado: (2008) -
Commissioning of the SCT
por: Hayward, H
Publicado: (2008) -
The ATLAS SCT: Commissioning Experience and SLHC Upgrade
por: Mitrevski, J
Publicado: (2008) -
The ATLAS SCT grounding and shielding concept and implementation
por: Bates, RL, et al.
Publicado: (2012)