Cargando…
CMS Drift Tube Chambers Read-Out Electronics
With CMS installation nearing completion, the three levels of the final read-out system of the Drift Tube (DT) chambers are presented. First, are the Read Out Boards (ROB), responsible for time digitization of the signals generated by a charged particle track. Second, the Read Out Server (ROS) board...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2008
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-007.190 http://cds.cern.ch/record/1089265 |
Sumario: | With CMS installation nearing completion, the three levels of the final read-out system of the Drift Tube (DT) chambers are presented. First, are the Read Out Boards (ROB), responsible for time digitization of the signals generated by a charged particle track. Second, the Read Out Server (ROS) boards receive data from 25 ROB channels through a 240-Mbps copper link and perform data merging for further transmission through a 800 Mbps optical link. Finally, the Detector Dependent Units (DDU) merge data from 12 ROS to build an event fragment and send it to the global CMS DAQ through an S-LINK64 output at 320 MBps. DDUs also receive synchronization commands from the TTC system (Timing, Trigger, and Control), perform error detection on data, and send a fast feedback to the TTS (Trigger Throttling System). Functionality of these electronics has been validated in the laboratory and in several test-beams, including an exercise integrated with a fraction of the whole CMS detector and electronics that demonstrated proper operation and integration within the final CMS framework. |
---|