Cargando…

Accelerator plans stalled after US and UK cuts

Budget woes spell trouble for . Eric Hand & Geoff Brumfiel Budget hole: the would be built from superconducting cavities.FERMILABThe machine on which the world's particle physicists have staked the future of their discipline hangs in the balance owing to budget cuts.

Detalles Bibliográficos
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1090843
_version_ 1780913760983056384
collection CERN
description Budget woes spell trouble for . Eric Hand & Geoff Brumfiel Budget hole: the would be built from superconducting cavities.FERMILABThe machine on which the world's particle physicists have staked the future of their discipline hangs in the balance owing to budget cuts.
id cern-1090843
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-10908432019-09-30T06:29:59Zhttp://cds.cern.ch/record/1090843engAccelerator plans stalled after US and UK cutsOther Labs and InstitutesBudget woes spell trouble for . Eric Hand & Geoff Brumfiel Budget hole: the would be built from superconducting cavities.FERMILABThe machine on which the world's particle physicists have staked the future of their discipline hangs in the balance owing to budget cuts.PRESSCUT-H-2008-109oai:cds.cern.ch:10908432008
spellingShingle Other Labs and Institutes
Accelerator plans stalled after US and UK cuts
title Accelerator plans stalled after US and UK cuts
title_full Accelerator plans stalled after US and UK cuts
title_fullStr Accelerator plans stalled after US and UK cuts
title_full_unstemmed Accelerator plans stalled after US and UK cuts
title_short Accelerator plans stalled after US and UK cuts
title_sort accelerator plans stalled after us and uk cuts
topic Other Labs and Institutes
url http://cds.cern.ch/record/1090843