Cargando…
Final Test at the Surface of the ATLAS Endcap Muon Trigger Chamber Electronics
For the detector commissioning planned in 2007, sector assembly of the ATLAS muon-endcap trigger chambers and final test at the surface for the assembled electronics are being done in CERN and almost completed. For the test, we built up the Data Acquisition (DAQ) system using test pulse of two types...
Autores principales: | Kubota, T, Ishino, M, Kanaya, N, Kawamoto, T, Kobayashi, T, Kuwabara, T, Nomoto, H, Sakamoto, H, Yamaguchi, T, Fukunaga, C, Ikeno, M, Iwasaki, H, Nagano, K, Nozaki, M, Sasaki, O, Tanaka, S, Yasu, Y, Hasegawa, Y, Oshita, H, Takeshita, T, Nomachi, M, Sugaya, Y, Sugimoto, T, Okumura, Y, Takahashi, Y, Tomoto, M, Kadosaka, T, Kawagoe, K, Kiyamura, H, Kurashige, H, Niwa, T, Ochi, A, Omachi, C, Takeda, H, Lifshitz, R, Lupu, N, Bressler, S, Tarem, S, Kajomovitz, E, Ben Ami, S, Bahat Treidel, O, Benhammou, Ya, Etzion, E, Lellouch, D, Levinson, L, Mikenberg, G, Roich, A |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-007.463 http://cds.cern.ch/record/1091528 |
Ejemplares similares
-
The First Result of Global Commissioning of the ATLAS Endcap Muon Trigger System in ATLAS Cavern
por: Sugimoto, T, et al.
Publicado: (2007) -
The Commissioning status and results of ATLAS Level1 Endcap Muon Trigger System
por: Okumura, Y, et al.
Publicado: (2008) -
Installation and Test of the ATLAS Muon Endcap Trigger Chamber Electronics
por: Nomoto, Hiroshi, et al.
Publicado: (2007) -
Precise Timing Adjustment for the ATLAS Level1 Endcap Muon Trigger System
por: Suzuki, Y, et al.
Publicado: (2009) -
Test Beam results on the ATLAS First Level-1 Endcap Muon Trigger System
por: Maeno, T, et al.
Publicado: (2003)