Installation and Commissioning of the CMS Timing, Trigger and Control Distribution System
The Timing, Trigger and Control (TTC) distribution system must ensure high-quality clocking of the CMS experiment to allow the physics potential of the LHC machine to be fully exploited. This key system provides the synchronization tools – bunch clock, first level Triggers and fast commands – that e...
Autores principales: | Troska, J, Christiansen, T, Holzner, A |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-007.508 http://cds.cern.ch/record/1091748 |
Ejemplares similares
-
Installation and commissioning of the helium refrigeration system for the CMS Magnet
por: Perinic, G, et al.
Publicado: (2004) -
Commissioning of the CMS Cryogenic System After Final Installation in the Underground Cavern
por: Dupont, T, et al.
Publicado: (2010) -
The MedAustron Accelerator Control System: Design, Installation and Commissioning
por: Gutleber, J, et al.
Publicado: (2014) -
Manpower and organization for the installation and commissioning of LIL-systems
por: Madsen, J H B
Publicado: (1984) -
Quality Control of the CMS Tracker and ECAL Installed Optical Cabling
por: Ricci, D, et al.
Publicado: (2007)