Cargando…
Final Geometry of the 1232 LHC Dipoles
The 15 m long main dipoles for the Large Hadron Collider have now been installed in their final positions in the accelerator tunnel. Geometric measurements of the magnets after many of the production steps from industry to the cryostating, after cold tests and after preparation of the magnets for in...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/PAC.2007.4440211 http://cds.cern.ch/record/1092116 |
_version_ | 1780913802504568832 |
---|---|
author | Wildner, E Bajko, M Bestmann, P Fartoukh, S Jeanneret, JB Missiaen, D Tommasini, D |
author_facet | Wildner, E Bajko, M Bestmann, P Fartoukh, S Jeanneret, JB Missiaen, D Tommasini, D |
author_sort | Wildner, E |
collection | CERN |
description | The 15 m long main dipoles for the Large Hadron Collider have now been installed in their final positions in the accelerator tunnel. Geometric measurements of the magnets after many of the production steps from industry to the cryostating, after cold tests and after preparation of the magnets for installation, have been made, permitting careful control of the shape of the magnet, the positioning of the field correctors, and the final positioning in the tunnel. The result of the geometry control at the different production stages, from industry to CERN, using different kinds of control procedures and analysis, is reported. |
id | cern-1092116 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10921162023-05-31T13:21:37Zdoi:10.1109/PAC.2007.4440211http://cds.cern.ch/record/1092116engWildner, EBajko, MBestmann, PFartoukh, SJeanneret, JBMissiaen, DTommasini, DFinal Geometry of the 1232 LHC DipolesAccelerators and Storage RingsThe 15 m long main dipoles for the Large Hadron Collider have now been installed in their final positions in the accelerator tunnel. Geometric measurements of the magnets after many of the production steps from industry to the cryostating, after cold tests and after preparation of the magnets for installation, have been made, permitting careful control of the shape of the magnet, the positioning of the field correctors, and the final positioning in the tunnel. The result of the geometry control at the different production stages, from industry to CERN, using different kinds of control procedures and analysis, is reported.LHC-PROJECT-Report-1062CERN-LHC-PROJECT-Report-1062oai:cds.cern.ch:10921162007 |
spellingShingle | Accelerators and Storage Rings Wildner, E Bajko, M Bestmann, P Fartoukh, S Jeanneret, JB Missiaen, D Tommasini, D Final Geometry of the 1232 LHC Dipoles |
title | Final Geometry of the 1232 LHC Dipoles |
title_full | Final Geometry of the 1232 LHC Dipoles |
title_fullStr | Final Geometry of the 1232 LHC Dipoles |
title_full_unstemmed | Final Geometry of the 1232 LHC Dipoles |
title_short | Final Geometry of the 1232 LHC Dipoles |
title_sort | final geometry of the 1232 lhc dipoles |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1109/PAC.2007.4440211 http://cds.cern.ch/record/1092116 |
work_keys_str_mv | AT wildnere finalgeometryofthe1232lhcdipoles AT bajkom finalgeometryofthe1232lhcdipoles AT bestmannp finalgeometryofthe1232lhcdipoles AT fartoukhs finalgeometryofthe1232lhcdipoles AT jeanneretjb finalgeometryofthe1232lhcdipoles AT missiaend finalgeometryofthe1232lhcdipoles AT tommasinid finalgeometryofthe1232lhcdipoles |