Cargando…

Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC

By end of November 2006, the last main superconducting quadrupole cold mass needed for the installation was delivered by ACCEL Instruments to CERN. In total, 360 cold masses for the arc regions of the machine and 32 special units dedicated to the dispersion suppressor regions are installed in the LH...

Descripción completa

Detalles Bibliográficos
Autores principales: Tortschanoff, Theodor, Modena, M, Papaphilippou, Y, Rossi, L, Schirm, K M, Burgmer, R, Klein, H U, Krischel, D, Schellong, B, Schmidt, P, Durante, M, Payn, A, Rifflet, J M, Simon, F
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:https://dx.doi.org/10.1109/PAC.2007.4440210
http://cds.cern.ch/record/1092118
_version_ 1780913802939727872
author Tortschanoff, Theodor
Modena, M
Papaphilippou, Y
Rossi, L
Schirm, K M
Burgmer, R
Klein, H U
Krischel, D
Schellong, B
Schmidt, P
Durante, M
Payn, A
Rifflet, J M
Simon, F
author_facet Tortschanoff, Theodor
Modena, M
Papaphilippou, Y
Rossi, L
Schirm, K M
Burgmer, R
Klein, H U
Krischel, D
Schellong, B
Schmidt, P
Durante, M
Payn, A
Rifflet, J M
Simon, F
author_sort Tortschanoff, Theodor
collection CERN
description By end of November 2006, the last main superconducting quadrupole cold mass needed for the installation was delivered by ACCEL Instruments to CERN. In total, 360 cold masses for the arc regions of the machine and 32 special units dedicated to the dispersion suppressor regions are installed in the LHC ring. The latter ones contain the same main magnet but different types of correctors and are of increased length with respect to the regular arc ones. The end of the fabrication of these magnets coincided with the end of the main dipole deliveries allowing a parallel assembly into their cryostats and installation into the LHC tunnel. The positioning into the tunnel was optimized using the warm field measurements performed in the factory. On the other hand, the correct slot assignment of the quadrupoles was complicated due to the multitude of variants and to the fact that a number of units needed to be replaced by spares which were customized for other slots. The paper gives some final data about the successful fabrication at ACCEL Instruments and explains the issue of their best positions in the machine.
id cern-1092118
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10921182023-05-31T13:21:37Zdoi:10.1109/PAC.2007.4440210http://cds.cern.ch/record/1092118engTortschanoff, TheodorModena, MPapaphilippou, YRossi, LSchirm, K MBurgmer, RKlein, H UKrischel, DSchellong, BSchmidt, PDurante, MPayn, ARifflet, J MSimon, FCompletion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHCAccelerators and Storage RingsBy end of November 2006, the last main superconducting quadrupole cold mass needed for the installation was delivered by ACCEL Instruments to CERN. In total, 360 cold masses for the arc regions of the machine and 32 special units dedicated to the dispersion suppressor regions are installed in the LHC ring. The latter ones contain the same main magnet but different types of correctors and are of increased length with respect to the regular arc ones. The end of the fabrication of these magnets coincided with the end of the main dipole deliveries allowing a parallel assembly into their cryostats and installation into the LHC tunnel. The positioning into the tunnel was optimized using the warm field measurements performed in the factory. On the other hand, the correct slot assignment of the quadrupoles was complicated due to the multitude of variants and to the fact that a number of units needed to be replaced by spares which were customized for other slots. The paper gives some final data about the successful fabrication at ACCEL Instruments and explains the issue of their best positions in the machine.LHC-PROJECT-Report-1064CERN-LHC-PROJECT-Report-1064oai:cds.cern.ch:10921182007
spellingShingle Accelerators and Storage Rings
Tortschanoff, Theodor
Modena, M
Papaphilippou, Y
Rossi, L
Schirm, K M
Burgmer, R
Klein, H U
Krischel, D
Schellong, B
Schmidt, P
Durante, M
Payn, A
Rifflet, J M
Simon, F
Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title_full Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title_fullStr Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title_full_unstemmed Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title_short Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
title_sort completion of the series fabrication of the main superconducting quadrupole magnets of lhc
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1109/PAC.2007.4440210
http://cds.cern.ch/record/1092118
work_keys_str_mv AT tortschanofftheodor completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT modenam completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT papaphilippouy completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT rossil completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT schirmkm completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT burgmerr completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT kleinhu completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT krischeld completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT schellongb completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT schmidtp completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT durantem completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT payna completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT riffletjm completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc
AT simonf completionoftheseriesfabricationofthemainsuperconductingquadrupolemagnetsoflhc