Cargando…
Completion of the Series Fabrication of the Main Superconducting Quadrupole Magnets of LHC
By end of November 2006, the last main superconducting quadrupole cold mass needed for the installation was delivered by ACCEL Instruments to CERN. In total, 360 cold masses for the arc regions of the machine and 32 special units dedicated to the dispersion suppressor regions are installed in the LH...
Autores principales: | Tortschanoff, Theodor, Modena, M, Papaphilippou, Y, Rossi, L, Schirm, K M, Burgmer, R, Klein, H U, Krischel, D, Schellong, B, Schmidt, P, Durante, M, Payn, A, Rifflet, J M, Simon, F |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/PAC.2007.4440210 http://cds.cern.ch/record/1092118 |
Ejemplares similares
-
The LHC Main Quadrupoles during Series Fabrication
por: Tortschanoff, Theodor, et al.
Publicado: (2006) -
Performance of the LHC Arc Superconducting Quadrupoles Towards the End of their Series Fabrication
por: Tortschanoff, Theodor, et al.
Publicado: (2006) -
Launching of Series Fabrication of the LHC Main Quadrupoles
por: Burgmer, R, et al.
Publicado: (2002) -
Industrialization of LHC main quadrupole cold masses up to series production
por: Burgmer, R, et al.
Publicado: (2004) -
Performance of the First LHC Main Quadrupoles Made in Industry
por: Burgmer, R, et al.
Publicado: (2003)