Cargando…

Technical Challenges of the EURISOL Beta-beam

The so‐called beta‐beam concept [1] for accelerator‐driven neutrino experiments envisages the production of a pure beam of electron neutrinos (or their antiparticles) through the beta‐decay of radioactive ions circulating in a high‐energy storage ring. The conceptual design of a beta‐beam facility i...

Descripción completa

Detalles Bibliográficos
Autor principal: Hancock, S
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.2899009
http://cds.cern.ch/record/1097112
_version_ 1780913918898601984
author Hancock, S
author_facet Hancock, S
author_sort Hancock, S
collection CERN
description The so‐called beta‐beam concept [1] for accelerator‐driven neutrino experiments envisages the production of a pure beam of electron neutrinos (or their antiparticles) through the beta‐decay of radioactive ions circulating in a high‐energy storage ring. The conceptual design of a beta‐beam facility is ongoing within the framework of the EURISOL Design Study [2]. The required acceleration and accumulation of an unprecedented number of ions brings many challenges. Those most recently addressed are presented in this paper together with a brief overview of some of the salient features of the current design machine by machine.
id cern-1097112
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-10971122019-09-30T06:29:59Zdoi:10.1063/1.2899009http://cds.cern.ch/record/1097112engHancock, STechnical Challenges of the EURISOL Beta-beamAccelerators and Storage RingsThe so‐called beta‐beam concept [1] for accelerator‐driven neutrino experiments envisages the production of a pure beam of electron neutrinos (or their antiparticles) through the beta‐decay of radioactive ions circulating in a high‐energy storage ring. The conceptual design of a beta‐beam facility is ongoing within the framework of the EURISOL Design Study [2]. The required acceleration and accumulation of an unprecedented number of ions brings many challenges. Those most recently addressed are presented in this paper together with a brief overview of some of the salient features of the current design machine by machine.oai:cds.cern.ch:10971122008
spellingShingle Accelerators and Storage Rings
Hancock, S
Technical Challenges of the EURISOL Beta-beam
title Technical Challenges of the EURISOL Beta-beam
title_full Technical Challenges of the EURISOL Beta-beam
title_fullStr Technical Challenges of the EURISOL Beta-beam
title_full_unstemmed Technical Challenges of the EURISOL Beta-beam
title_short Technical Challenges of the EURISOL Beta-beam
title_sort technical challenges of the eurisol beta-beam
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1063/1.2899009
http://cds.cern.ch/record/1097112
work_keys_str_mv AT hancocks technicalchallengesoftheeurisolbetabeam